top of page
1
2
7
1
1/7
DOMESTIC AIRPORT
ORG AIRPORT
2005
The project includes the remodeling and extension of the existing airport terminal to increase capacity and enhance passenger experience. The current arrivals building will be removed on a phased basis, with construction of the redesigned integrated terminal taking place in a manner which allows the airport to continue operating.
A double-height atrium will house larger departure gates, all overlooking the aviation apron. A new mezzanine level will house the airside departures lounge, while the new arrivals facility will be created to bring it within the regulatory requirements for its safety transition zone.
bottom of page